In order to verify the safety and rationality of the direct supply aluminum water transportation line and the standardization of related processes, and to better prevent and deal with the sudden problems after the implementation of direct supply of aluminum water, Zongshen parts will be at 2 pm on September 4, 2018. In the die-casting workshop, a direct-supply aluminum water exercise was successfully held. Relevant departments from the production, technology, quality, and management departments of the business department participated in the exercise. Xiang Dudong, the deputy general manager of the parts business department, served as the on-site commander.
At two o'clock in the afternoon, the aluminum water transport vehicle from the supplier Huiren Company arrived at the die-casting workshop on time under the escort of the relevant personnel of the Group's security department. The quality inspector immediately tested the chemical composition of the aluminum water. After passing the test, the aluminum package was tested. Safe delivery.
Under the leadership of the die-casting production department, the aluminum package was transferred to the scale and began to be weighed for the first time. After the weighing was completed, the water transfer worker safely poured the aluminum water into the holding furnace next to it and transferred the empty aluminum package to the The second weighing was carried out at the scale. The Group's security department, warehouse personnel and supplier personnel jointly monitored the weighing process and recorded the weighing results twice. The two weighing results were compared and calculated to obtain the total weight of the aluminum water.
After all the aluminum water has been weighed, the warehouse staff will calculate the weight of the aluminum water and print the “Purchase Material Checklist” in the SAP system. Around 4 pm, the aluminum water transport vehicle was driven out of the park under the guidance of the Group's security department, and the direct supply of aluminum water exercise ended. After the exercise, Deputy General Manager of Production Xiang Xiang led a team of relevant personnel and supplier representatives to hold a brief communication meeting in the conference room on the third floor of the die-casting factory. The two sides dealt with the unloading site, transportation time and staffing. A thorough discussion was carried out, and corresponding solutions were proposed for specific problems to ensure the safety and stability of the entire direct supply of aluminum water.
Through this direct supply of aluminum water exercises, Zongshen Parts Division and supplier Huiren Company reached more consensus on the transportation safety and process specifications of direct supply of aluminum water, which is to improve the safety and stability of direct supply aluminum water. Strengthening the close cooperation between the two companies has an important role in promoting.
In the future, Zongshen Parts Business Unit will also carry out projects that save energy costs and equipment investment from time to time, go to capacity, destock, de-leverage, transform and enhance traditional comparative advantages, enhance sustained growth momentum, and promote Zongshen parts to achieve higher Quality, more efficient and more sustainable development!
Last one:Implementing new standards and...
Next article:The 2018 QC results presentati...HOME| ABOUT US | NEWS | DISPLAY | QUALITY | THROUGHPUT | SERVICE | JOIN US | CONTACT
2016 all rights reserved. | Chongqing Zongshen Component Manufacture Co.,Ltd Technical support:www.cnge.net.cn
Friendship link: 汽摩交易所 、 动力24 、 动力24商城 、 宗申戈梅利 、 宗申巴贝锐 、 宗申机车 、 宗申通机 、 宗申动力 、 宗申产业集团
Address:No.126,Yunan Avenue, Banan District, Chongqing City Phone:(86-023)66372038
Email:ouw@zsengine.com Zip code:400054